Case studies of power solutions in large-scale sports events
Reliable power supply necessary for live broadcasting and environmentally friendly options.
At a large-scale tennis tournament held in Tokyo, Aggreko provided a 90kVA battery energy storage system (BESS) to ensure that broadcasting could continue without interruption even during power outages. This system automatically switches in the event of a generator failure, securing backup power for up to 30 minutes. It was seamlessly integrated into the existing infrastructure and covered the entire tournament over a period of 12 days. As a result, it achieved a balance of reliability and environmental consideration, delivering uninterrupted power to fans around the world.
basic information
- Backup power: Battery Energy Storage System (BESS) - Capacity: 90kVA - Backup time: Up to 30 minutes - Purpose: Automatic switch during generator failure, protects critical broadcasting equipment - Rental period: 12 days (covers the entire tournament) - Installation: Seamless integration with existing infrastructure, automatic start during power outages - Features: Reliability, environmental consideration, live event support
Price range
Delivery Time
Applications/Examples of results
Live sports events: Backup power to continue broadcasting without interruption during a power outage Protection of important equipment: Automatic switching during generator failure to ensure stable operation of broadcasting equipment Environmentally friendly power supply: A cleaner option compared to conventional generators
catalog(1)
Download All CatalogsRecommended products
Distributors
Our company supports customers around the clock to supply the necessary power, as well as heating and cooling. All of this is driven by our trademark passion, unparalleled international experience, and the knowledge gained from it. From urban development to commercial projects and life-saving efforts, we deliver our expertise and equipment anywhere from major cities to remote rural areas.











