For scale removal from cooling towers, use "Aqua Crystal Ring (ACR)."
Is there anyone else who wants to try the method that completely removes scale from the cooling tower?
**For those struggling with scale removal in cooling towers** Stubborn scale that won't come off even with chemicals, will be completely removed with "zero chemicals"! **We can solve all these problems!** ✓ The scale is just terrible. ✓ Cooling efficiency has decreased, and there are occasional abnormal shutdowns. ✓ The filler is clogged with scale. ✓ It’s hard to remove even with chemicals. ✓ Maintenance efforts and frequency are increasing. ✓ I want to reduce chemical costs. **Five benefits of choosing us** ■ Benefit 1: Significantly improved cooling efficiency! We remove scale and restore the original cooling performance. ■ Benefit 2: No chemicals, power, or construction required! Just place it in water. No special work is needed. ■ Benefit 3: Maintenance-free Just wipe the main unit with a cloth when it gets dirty. Maintenance is complete in one minute! ■ Benefit 4: Reduced running costs No need for chemicals, electricity, or additional maintenance costs. Significantly cut expenses. ■ Benefit 5: Environmentally friendly Contributes to reducing waste and CO2 emissions with zero chemicals and power. ★ Moreover, to prevent the reattachment of scale, the lifespan of the equipment and piping inside the cooling tower will be greatly extended.
basic information
【Recommended for such companies】 ✓ Cannot use chemicals due to hygiene or manufacturing reasons ✓ Hesitant to introduce large devices such as "electrolytic scale removal systems" ✓ Prefer minimal maintenance ✓ Previous scale countermeasures have not been effective 【Three features of our product】 ■ Feature 1: Easy installation without construction or tools Installation is as simple as attaching it with the included insulock. Anyone can easily install it. ■ Feature 2: Can be installed without stopping operation It can be introduced simply by placing it in water, without needing to stop operation. * In some cases, stopping operation may be necessary. ■ Feature 3: Can be installed regardless of size or type It can be introduced into any cooling tower, regardless of size, shape, or type. 【Specifications】 ・Size: Diameter 100mm, Thickness 30mm ・Material: Resin (hardened polyethylene) ・Included accessories: Chain, zip ties ・Operating temperature range: 1℃ to 80℃ ・Warranty period: 3 years For information on the safety of our product (Product Safety Data Sheet/SDS), please visit our website below. https://acr.archives.co.jp/specification/
Price information
Please send us the specifications of the cooling tower you are having trouble with, along with any current photos if possible. We will propose the optimal plan and estimate for where and how many units should be installed.
Delivery Time
Model number/Brand name
Aqua Crystal Ring (abbreviated as ACR) that completely removes scale without chemicals.
Applications/Examples of results
■Example 1: A major hotel in Tokyo - Cooling tower for air conditioning (1800RT) A large cooling tower that has been in operation for 25 years. The cooling efficiency had significantly declined due to scale and rust, and they were considering replacing the cooling tower. Including disposal, new installation, piping work, and losses due to downtime, the estimated cost was about 200 million yen. They decided, "It wouldn't be too late to try this product first," and installed it. As a result, they achieved scale removal and rust suppression, extending the life of the cooling tower and significantly reducing costs. (Afterward, installations were also made at related hotels in Hakone and Ito.) ■Example 2: A major ice manufacturer in Saitama - Cooling tower (125RT) A cooling tower that had been in operation for 18 years. A significant amount of scale had accumulated on the filler, leading to a deterioration in cooling efficiency. They were troubled because the scale could not be removed even with chemical treatment. About 10 months after installation, approximately 20 kg of scale was removed, and cooling efficiency was restored. (Afterward, they also installed it on another cooling tower.) ★In addition, we have a cumulative total of over 100 installation cases, regardless of large, medium, or small sizes. We provide detailed introductions with photos in our 'Case Study Collection,' so please download it now to confirm its effectiveness.
Related Videos
catalog(7)
Download All Catalogs
News about this product(14)
-
[Case Study Vol. 10] A large amount of scale attached to the louver was removed.
■Consultation Details: There was a consultation regarding issues with scale adhesion. ■Equipment: Small cooling tower ■Location: Tokyo, Japan ■Industry: Automotive parts factory ■Result: We have introduced this with photos on our company website below. *Please click on the "Related Links" below to view.
-
Is there anyone else who wants to conduct a water quality test for free? [Limited to the first 5 companies]
【To companies with cooling towers】 Can your cooling tower really get through this summer without any troubles? If you have even a little anxiety... Why not have a "health check" for your cooling tower? We will conduct a water quality test for free, limited to the first 5 companies! =========== Finally, the summer season when cooling towers are at their peak operation is approaching. This time of year marks the beginning of the season when cooling equipment faces the most load. And every year at this timing, we receive numerous inquiries from companies nationwide, such as: "The cooling efficiency has decreased, and cooling shortages are occurring." "The pump has stopped urgently due to cooling abnormalities." "The pipes are clogged with scale, reducing the supply water volume." We receive many inquiries regarding troubles caused by cooling shortages. So, why do cooling troubles occur in the first place? For more details, please visit the special page below. ↓↓↓ https://lp.archives.co.jp/inspection
-
We have compiled examples of rust removal and rust prevention for chillers!
We also remove and suppress rust from chillers, piping, and heat exchangers. The 'Aqua Crystal Ring (ACR)' is a scale removal device that demonstrates tremendous effectiveness in removing scale from cooling towers, without the need for chemicals or power supply. ACR not only excels in scale removal but also has a remarkable effect on rust. In most cases, a large amount of rust accumulates in chillers (cooling water circulation devices) and piping. As a result, there are often cases where the water inside the chiller turns bright red (red water). By using ACR, you can convert red rust into black rust, improving the murky red cooling water to clear. This is achieved without any use of chemicals and does not require a power supply. ◆◆ We have received a lot of feedback ◆◆ Recently, we have been receiving many inquiries about rust in chillers and piping, in addition to scale removal from cooling towers. In response, we have compiled our past achievements and case studies. Please see for yourself how the bright red water has turned clear.
-
【ACR】Effective for rust removal and rust prevention on chillers!
<Removes and suppresses rust from chillers, piping, and heat exchangers> The 'Aqua Crystal Ring (ACR)' is a scale removal device that demonstrates tremendous effectiveness in removing scale from cooling towers, without the need for chemicals or power supply. ACR not only removes scale but also has a remarkable effect on rust. In most cases, a large amount of rust accumulates in chillers (cooling water circulation devices) and piping. As a result, it is common for the water inside the chiller to turn bright red (red water). By using ACR, red rust can be converted to black rust, and the murky red cooling water can be improved to a clear state. This is achieved without any use of chemicals and does not require a power supply. ◆◆ We have received a lot of feedback ◆◆ Recently, in addition to scale removal from cooling towers, we have received many inquiries regarding rust in chillers and piping. In response, we have compiled materials on the effects of ACR on rust. Companies struggling with rust, please take a look.
-
[Case Study Vol. 9] The scale accumulated over a year and a half has dropped.
■Consultation Details: We received a request for scale removal from a round cooling tower that has been in operation for a year and a half since its installation. We have earned trust in ACR as it has been installed in other equipment as well. ■Equipment: Small Cooling Tower ■Location: Ome, Tokyo ■Industry: Automotive Parts Factory ■Results: We have introduced this with photos on our company website below. *Please click on the "Related Links" below to view.