[G-cam Introduction Case] Fujimoto Construction Co., Ltd.
Streamlining on-site management and reducing overtime by 50 hours per month! A case study from a construction company that also contributed to the arrest of a thief.
We would like to introduce a case study of the implementation of "G-cam" at Fujimoto Construction Co., Ltd., which specializes in wooden architecture and is responsible for contracting, designing, and constructing new residential buildings as well as renovations. At the time of implementation, the significant challenge was the enormous amount of time required for site management. Within the construction area, there were locations that took up to two hours to reach one way, and during the day, moving between sites consumed a lot of time, often resulting in a full day being spent just traveling between several sites. By enabling remote checks of the sites via camera, it is reported that overtime was reduced by about 50 hours per month, allowing the time previously spent on travel to be redirected to the company's core business activities. [Purpose of Implementation] ■ To improve the efficiency of site management ■ To prevent theft and nuisance activities at the sites *For more details, please refer to the related links or feel free to contact us.
basic information
【Effects of Implementation】 ■ The travel time associated with on-site management has been significantly reduced (approximately 50 hours/month). ■ Incidents of nuisance behavior at the site, such as illegal dumping, have become almost zero. ■ A theft incident occurred at the site, but the footage recorded by the camera was crucial in leading to the arrest of the perpetrator. *For more details, please refer to the related links or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the related links or feel free to contact us.