日本ケイデンス・デザイン・システムズ社 Official site

[Case Study of Data Center Operation Management Solution] Large-Scale Data Center

Maximize capacity! Introducing the benefits of utilizing CFD analysis in data center operations management based on successful implementation case studies.

This is a case study of the digital twin technology "Cadence Reality DC Design/Insight (formerly 6SigmaDCX)" used for operational management of data centers while utilizing thermal flow analysis. As part of a project to integrate IT equipment, Cadence was asked to assist in improving data center operations before implementing large-scale equipment installations. This verification was essential for safely executing the project. In conducting the verification, the company created a 3D model as a digital twin of the facility before improvements. They analyzed the results to determine whether improvements were necessary in the room before implementing IT equipment in the real environment. From the company's verification, it was possible to safely carry out large-scale IT equipment integration projects based on scientific evidence, maximizing the capacity of the data center. [Results] - Demonstrated optimization of airflow and reduction of operational costs. - Implemented IT equipment layout plans based on evidence identified from the analysis, allowing for the acquisition of appropriate data in advance. *For more details, please refer to the PDF document or feel free to contact us.*

Related Link - https://www.cadence.com/ja_JP/home.html

basic information

For more details, please refer to the PDF document or feel free to contact us.

Price range

Delivery Time

Applications/Examples of results

For more details, please refer to the PDF document or feel free to contact us.

Detailed information

【DataCenter Design/Insight (formerly 6SigmaDCX) Success Case】Large-scale Data Center within a Company

TECHNICAL

Distributors

Recommended products