Case Study of Solar Power and Battery Installation for Construction Companies: Reducing Electricity Costs for Business Locations
For construction companies looking to review their electricity costs and aim for continuous cost reduction, we present a case study on the introduction of a 54.4 kW solar power system and a 46.08 kWh battery storage system.
This is a case study aimed at those considering reducing electricity costs and reviewing energy expenses at construction company offices. In this case, a solar power system of 54.4 kW and a storage battery of 46.08 kWh were installed, achieving a reduction effect of approximately 440,000 yen. You can use this as a reference when considering ways to reduce maintenance costs and utilize renewable energy at your office. *For more details, please feel free to contact us.*
basic information
Solar power generation 54.4kW, battery storage 46.08kWh *For more details, please feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
Reduction of electricity costs and review of energy expenses at construction company offices. *For more details, please feel free to contact us.*
catalog(1)
Download All CatalogsRecommended products
Distributors
Our company is engaged in renewable energy businesses such as the design, construction, operation, and material sales of solar power generation systems, as well as exterior construction. After gaining experience as a mounting frame manufacturer and EPC, we developed the industrial storage battery system 'eCHARGE' and obtained a patent for direct current interconnection. As a specialized company in solar power generation, we respond to various needs and contribute to the creation of a safe and comfortable society.

