Emergency cooling measures and operational continuity support in the event of a turbo chiller failure.
BCP measures for cooling equipment failure. Case study of temporary cooling system implementation.
Failures or regular maintenance of existing cooling equipment such as chillers, refrigeration units, and cooling towers pose significant risks that can lead to production stoppages or reduced equipment capacity. Aggreko provides cooling solutions that combine temporary chillers, pumps, power distribution panels, cables, and piping equipment. In this case, we quickly established a temporary chiller system in response to an unexpected failure of the existing cooling equipment, ensuring the necessary cooling capacity and minimizing the impact on operations. We support various industries, including manufacturing, chemicals, food, pharmaceuticals, and steel, with measures against refrigeration unit failures, emergency cooling, backup cooling during equipment updates, regular maintenance responses, and BCP measures.
basic information
Specifications - Temporary air-cooled chillers: 10 units of 175kW each Total cooling capacity: 1,750kW - Pump unit - Power distribution panel - Power cables - Temporary piping equipment Features Modular configuration with 10 chillers of 175kW each Allows for stepwise capacity adjustment according to required cooling capacity Can be implemented in a short period during failures of existing cooling equipment Provides stable cooling capacity while ensuring redundancy
Price range
Delivery Time
Applications/Examples of results
Applications and Examples of Achievements: Iron and Steel Industry (Blast Furnace, Electric Furnace, Rolling Equipment, Oxygen Plant) Oil and Chemical Plants Oil Refining and Energy-related Equipment Food and Beverage Factories Pharmaceutical and Life Science Facilities Automobile and Parts Manufacturing Factories Semiconductor and Electronic Component Factories Data Centers Paper and Pulp Factories General Manufacturing and Process Industries Applicable Uses: Backup cooling during chiller and refrigeration unit failures Emergency response during cooling tower failures Alternative cooling during regular maintenance (shutdown) Temporary cooling capacity reinforcement due to increased production capacity BCP (Business Continuity Plan) measures Temporary cooling during plant trial runs and equipment renewal periods
catalog(1)
Download All CatalogsRecommended products
Distributors
Our company supports customers around the clock to supply the necessary power, as well as heating and cooling. All of this is driven by our trademark passion, unparalleled international experience, and the knowledge gained from it. From urban development to commercial projects and life-saving efforts, we deliver our expertise and equipment anywhere from major cities to remote rural areas.