[Power Supply Design Proposal Case] Shortening Development Time by Library Creation of Design Specifications and Drawings
Expand the design of similar specifications and shorten the design lead time! Address the development period within 3 months, including evaluation!
We received a request from the customer to shorten the development period for the power supply unit. Normally, it takes about 6 months to go from design to manufacturing and evaluation for a 1 to 2-channel power supply unit, but this time they inquired whether it could be done in 3 months. Our company has a system in place to shorten the design lead time by creating a library of design specifications and drawings. In this case, we were able to shorten the design lead time by developing a design with similar specifications, allowing us to complete the development period, including evaluation, in 3 months. [Challenges] ■ We want to shorten the development period for the power supply unit (we would like it to be completed in 3 months) - For a 1 to 2-channel power supply unit Normally: It takes about 6 months from design to manufacturing and evaluation. *For more details, please refer to the related link page or feel free to contact us.
basic information
【Solution】 ■Our Features ・We have a library of design specifications and drawings. ・We have built a system to shorten design lead times. ■Response in This Case ・Developed designs with similar specifications. ・Shortened design lead times. ・Managed to respond within 3 months, including evaluation of the development period. *For more details, please refer to the related links page or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the related link page or feel free to contact us.