Comprehensive Power Diagnosis for the Wood Processing Industry
We visualize the electricity costs of the lumber processing factory and achieve energy conservation.
In the wood processing industry, the rising electricity costs have become a significant challenge for management. Particularly in factories with equipment that consumes a lot of electricity, such as dryers and cutting machines, understanding power usage and efficient operation is essential. However, if it is not possible to accurately grasp where and how much electricity is being used, there is a risk of overlooking unnecessary power consumption and missing opportunities for cost reduction. Aim Co., Ltd.'s "Factory Comprehensive Power Diagnosis" thoroughly analyzes your electricity usage and clarifies the priorities for energy-saving measures, strongly supporting the reduction of electricity costs. 【Usage Scenarios】 - Wood processing factories - Sawmills - Plywood factories 【Benefits of Implementation】 - Visualization of electricity usage - Clarification of priorities for energy-saving measures - Achievement of electricity cost reduction - Cost reduction
basic information
【Features】 - Detailed analysis of the overall power usage in the factory - Acquisition of power data for 2 weeks to 3 months - Analysis of power usage breakdown, load fluctuations, and demand trends - Visualization of reduction potential and improvement priorities - Estimation of investment payback period 【Our Strengths】 AIM Corporation has a proven track record in energy-saving technologies for refrigeration and air conditioning systems. We provide high return on investment solutions through improvement proposals that leverage existing equipment. In addition to energy-saving diagnostics, we also offer the implementation of the energy-saving device "Riduck."
Price information
Basic Diagnosis: 198,000 yen (excluding tax). For a factory with an annual electricity cost of 20 million yen, a 1% improvement can reduce costs by 200,000 yen. Standard Diagnosis: 580,000 yen (excluding tax). For a factory with an annual electricity cost of 20 million yen, a 2.9% improvement can be recovered. Premium Diagnosis: 980,000 yen (excluding tax). For a factory with an annual electricity cost of 30 million yen, a 3.3% improvement can be recovered. The cost of updating one refrigeration unit is between 15 million and 30 million yen. Before that, why not understand the "overall structure of wasted electricity" for 980,000 yen?
Price range
P4
Delivery Time
P4
There is a limited number of loggers, so please consult with us.
Model number/Brand name
Comprehensive Power Diagnosis for Factories
Applications/Examples of results
There are achievements from 13 companies, including food manufacturing factories and meat processing centers. Feedback from factory managers and energy-saving managers indicated that they seemed to know the percentage of electricity consumption for power equipment such as refrigeration units, chillers, compressors, conveyor belts, and processing machines, but they did not actually know. It was also revealed that large power equipment does not consume a significant amount of electricity depending on operating hours and seasonal variations, which helps prioritize energy-saving measures and implement cost-effective energy-saving initiatives.
catalog(2)
Download All CatalogsRecommended products
Distributors
Reduce electricity costs without replacing your freezer. We are an energy-saving technology manufacturer specializing in "electricity cost reduction" for freezers and air conditioning units in food factories. "Rising electricity costs" and "earthquake risks." Aim Co., Ltd. reduces corporate management risks from both equipment and building perspectives. We have developed our own energy-saving devices such as "Riduck," which improves the mechanical efficiency of commercial freezers and air conditioning units, the wall reinforcement material "Kabetsuyoshi Series" for wooden houses, and the seismic diagnosis software "Mokutai Hakase N." We provide high return on investment solutions through improvement proposals that utilize existing equipment.







