ALGO ARTIS Official site

  • PRODUCT

Reduce planning creation time to less than 1/10 and cut operational costs by several tens of millions of yen annually (Kansai Electric Power).

ALGO ARTIS

Optimizing the fuel operation plan of coal-fired power plants with AI. Even those without expertise can now create longer-term plans in less than one-tenth of the time it used to take. For more details, please check the "News" section of ALGO ARTIS. https://service.algo-artis.com/news/20220121/

Related Links

Launch of Fuel Management Optimization Solution Utilizing Optimized AI (Algorithms) | ALGO ARTIS