Enapak Corporation "Custom Solutions"
You can achieve precise positioning when lifting heavy objects with a crane.
The synchronized lifting operation allows for precise positioning when lifting heavy objects with a crane. By utilizing this hydraulic system, the number of cranes required for the operation can be reduced, leading to a decrease in labor hours for the lifting work and cost savings. 【Product Lineup】 ○ Synchronized lifting operation ○ Automatic feed control system ○ Wire clamp (strand jack) and gantry hydraulic lifter combination ○ Self-supporting climbing tower For more details, please contact us or download the catalog.
basic information
【Features】 [Coordinated Lifting Operations] ○ Enables precise positioning when lifting heavy objects with a crane. ○ Reduces the number of cranes needed for operations, decreasing the labor required for lifting tasks and achieving cost savings. [Automated Dispatch Control System] ○ Provides solutions for the most complex and challenging bridge construction. [Combination of Wire Clamp (Strand Jack) and Gantry Hydraulic Lifter] ○ Capable of standing a 1,000-ton heavy object upright and moving it in all directions. [Self-Supporting Climbing Tower] ○ A lifting system using wire clamps (strand jacks) that can be constructed on-site. ○ Offers a wide range of applications. ○ A versatile lifting system. ○ Significantly reduces transportation and installation costs. ● For more details, please contact us or download the catalog.
Price information
Please contact us.
Delivery Time
Applications/Examples of results
For more details, please contact us or download the catalog.