Application Example: "Power Generation Equipment"
At the thermal power plant, after being lifted by a gantry hydraulic lifter, it was moved horizontally for 70 meters.
At the thermal power plant, wire clamps (strand jacks) were used to lift the turbines up to a height of 14 meters, and after being raised by a gantry hydraulic lifter, they were moved horizontally 70 meters. The first commercial offshore wind turbine is equipped with Enapack's synchronized lifting system. Enapack's system automatically adjusts the yoke installed on the tripod foundation where the pile foundation has been driven. This system performs precise positioning and maintains a constant level. As a result, the turbine mast was constructed quickly and efficiently. [Contents] - TS Power Plant - Bird Offshore Wind Turbine (Offshore Wind Farm) For more details, please contact us or download the catalog.
basic information
[Publication Content] [Project TS Power Plant] ○Location: Battle Mountain, Nevada, USA ○Implementation Period: 2007 ○System Used: Gantry Hydraulic Lifter Wire Clamp (Strand Jack) [Project Bird Offshore Wind Turbine (Offshore Wind Farm)] ○Location: North Sea, Germany ○Implementation Period: 2009 ○System Used: Synchronized Lifting System ●For more details, please contact us or download the catalog.
Price information
Please contact us.
Delivery Time
Applications/Examples of results
For more details, please contact us or download the catalog.