Application Case: "Oil and Gas"
We achieved a challenging relocation with Enerpac's hydraulic self-propelled system and wire clamp.
The world's first LNG regasification facility is constructed from 90,000 m³ of cement and 30,000 tons of steel. The relocation required a solution for lifting and sliding the massive structure. With Enerpac's hydraulic self-propelled system and wire clamps (strand jacks), the challenging relocation was achieved. Enerpac successfully lifted the 3,000-ton massive structure and slid it over uneven ground. [Contents] ○ LNG facility in the Adriatic Sea For more details, please contact us or download the catalog.
basic information
[Project Adriatic Sea LNG Facility] ○Location: Port Levante, Italy ○Implementation Period: 2007 ○System Used: Hydraulic Self-Propelled System Wire Clamp (Strand Jack) ●For more details, please contact us or download the catalog.