Case: Safely constructing a bridge over water using a hydraulic-driven launch nose.
All equipment operates seamlessly without interruption! A case study in public infrastructure development projects.
The KiwiRail project by Downer will permanently improve the country's main trunk railway network, allowing for the transportation of more freight. The Enerpac PUJ-1201E hydraulic electric pump is equipped with a two-stage pump operation for reduced cycle times and increased productivity. It was used in combination with the Enerpac thin lock ring cylinder, which is employed to support the load of the cantilever section. "The name Enerpac is synonymous with safety and reliability. All the equipment provided for the project functioned seamlessly without interruption," we have received this feedback. 【Case Overview】 ■ Customer: Downer, Jonel Hydraulics (New Zealand) ■ Products: RCH and RC series cylinders, ZE, ZU, and PUJ series pumps ■ Result: All operated normally without failure *For more details, please refer to the PDF document or feel free to contact us.
basic information
For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.