Case Study: Assembly of Offshore Platform Oil Rig Modules
The weight of each module exceeds 700 tons! An example of placement using the SBL1100 gantry.
Petrobras is constructing a new offshore oil platform for oil fields in the Santos Basin off the coast of Rio de Janeiro. Jaragua Equipamentos has been tasked with assembling four modules during the construction of the oil rig. Each module weighs over 700 tons and requires precise lifting and alignment during assembly. To achieve this, the company used the SBL1100 gantry to lift and position each module. By utilizing this product to assemble the oil rig, an efficient and safe solution was realized that allows for the precise positioning of loads weighing 700 tons. [Case Summary] ■ Customer: Jaragua Equipamentos (Brazil) ■ Product: SBL1100 Hydraulic Gantry ■ Result: An efficient and safe solution that allows for the precise positioning of loads weighing 700 tons. *For more details, please refer to the PDF document or feel free to contact us.
basic information
For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.