エナパック 本社 営業部 Official site

Case study: Accurate positioning of bridge girders using the Shinhoist system.

Save time and simplify digit arrangement! Introducing a case where downtime was reduced by up to half a day.

The Pacific Highway expansion project includes the construction of a new bridge over the Nambucca River. Once completed, the bridge will be 850 meters long, and each girder, weighing up to 158 tons and measuring 41 meters in length, must be positioned on precisely controlled bearings. To save time and simplify the placement of the girders, the teams from Universal Cranes and Smithbridge utilized a synchronized hoist system. The SyncHoist system, positioned under the lattice spreader, allowed for finite adjustments of the beams during placement onto the bearings. Additionally, it helped reduce downtime by up to half a day, as the team only needed to adjust the slings instead of changing the rigging gear for each placement. *For more details, please refer to the PDF document or feel free to contact us.*

Related Link - https://www.enerpac.co.jp/

basic information

【Case Summary】 ■Client: Universal Cranes, Smithbridge (Australia) ■Product: Synchronous Hoisting System ■Results - Enabled finite adjustments of the beam during bearing placement - Only required adjusting the sling instead of changing the rigging gear for each placement *For more details, please refer to the PDF document or feel free to contact us.

Price range

Delivery Time

Applications/Examples of results

For more details, please refer to the PDF document or feel free to contact us.

Enerpac Hydraulic Equipment Comprehensive Catalog [Digest Version]

CATALOG

Distributors

Recommended products