Case: Jack-up rig cantilever and drill floor
A case that enabled the completion of operations within half a day and created a detailed weight report!
Al Masaood Trading, the sales agent for Enerpac based in Dubai, was tasked with providing a safe, accurate, and compact solution for weighing the cantilever and drill floor of a jack-up rig. The "EVO-W Series Synchronous Lifting System," equipped with weight measurement capabilities, offers an appropriate solution for measuring the weight of the completed jack-up drilling rig cantilever and drill floor substructure. Using the EVO-W weighing program, the cantilever and drill floor were lifted simultaneously by several millimeters in multiple increments. All lifting and weighing data were displayed on the monitor of the PLC control system, achieving a fully coordinated, safe, and efficient operation. *For more details, please refer to the PDF document or feel free to contact us.*
basic information
【Case Overview】 ■Customer: Lamprel (Dubai, United Arab Emirates) ■Product: EVO-W Synchronizing Lifting System, CLRG Series Cylinder *For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.