エナパック 本社 営業部 Official site

Case: Unloading of a 1,300-ton hydrocracker

A case of lifting a hydrocracker from a barge to a self-propelled modular trailer (SPMT)!

Beluga was tasked with unloading a 1,306-ton hydrocracker from a barge and transporting it to land. Due to the weight and length of the hydrogenation unit, there were no alternatives. The company utilized two "SBL1100 gantry systems" to lift the hydrocracker from the barge to a self-propelled modular trailer (SPMT). After that, the SPMT transported the hydrogenation unit to the shore. 【Case Overview】 ■ Customer: Beluga Projects Logistic, CJSC (Russia) ■ Product: SBL1100 Hydraulic Gantry *For more details, please refer to the PDF document or feel free to contact us.

Related Link - https://www.enerpac.co.jp/

basic information

For more details, please refer to the PDF document or feel free to contact us.

Price range

Delivery Time

Applications/Examples of results

For more details, please refer to the PDF document or feel free to contact us.

Enerpac Hydraulic Equipment Comprehensive Catalog [Digest Version]

CATALOG

Distributors

Recommended products