Case Study: Loadout of Offshore Production Facility Modules
1,500 tons of pulling power! Used for loading utility, excavation, and process modules!
The ocean production facility is expected to be constructed in the Gulf of Mexico, positioned at a depth of over 5,000 feet. To build the tension leg platform, it was necessary to slide approximately 7,000 tons of modules into place. The "Enerpac strand jack" was used for loading utility, drilling, and process modules, providing a pulling force of 1,500 tons during the loading procedure. [Case Overview] ■ Client: Velard Transportation (Gulf of Mexico) ■ Product: Four HSL6500 strand jacks, 65kw hydraulic unit *For more details, please refer to the PDF document or feel free to contact us.
basic information
For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.