Case Study: New Listing - Sardeolica: Digitizing Wind Farm Maintenance to Achieve Cost Reduction, Improved Uptime, and Enhanced Safety Culture.

アスペンテックジャパン/AspenTech

アスペンテックジャパン/AspenTech

Sardeolica operates a 126 MW wind farm consisting of 57 wind turbines located in Urasai and Perdaxius, Italy, with an annual generation of 250 GWh. Since 2017, the company has embarked on a digitalization process aimed at optimizing plant control, planning maintenance during low wind periods, continuous improvement of productivity and machine uptime, and realizing a "digital" maintenance culture. 【Challenges】 • Extending the lifespan of the wind farm (a total of 57 turbines) and reducing maintenance costs • Optimizing scheduling through predictive maintenance requirements 【Achievements with Aspen Mtell】 • Proactively managing the wind farm to avoid catastrophic damage • Predicting potential issues up to six months in advance • Planning maintenance work during low-impact low wind periods • Improving plant uptime while reducing annual maintenance costs by up to 10% For more details, please refer to the related catalog.

Related catalog

Sardeolica: Digitizing the maintenance of wind power plants to achieve cost reduction, improved uptime, and enhanced safety culture.

TECHNICAL