Comprehensive Catalog: Engineering Simulation Software
AspenTech Engineering Solutions Comprehensive Catalog V14
We comprehensively introduce about 70 types of products that can be used for research and development, process design, and operations.
basic information
For more details, please check the lineup.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the related links or feel free to contact us.
catalog(2)
Download All CatalogsNews about this product(2)
-
[UPDATE] An overview of the product range has been added to the AspenTech Engineering Solutions Comprehensive Catalog V14.
We have updated the page of the "Engineering Solutions Comprehensive Catalog V14," which comprehensively introduces about 70 types of products available for research and development, process design, and operations. We have added key products and their summaries to the lineup list, presenting the information included in the comprehensive catalog in an easy-to-understand manner. For more details, please refer to the related product information.
-
Case Study: New Listing - South Korea's SK E&C Reduces Engineering and Estimation Man-Hours by 50% Using Aspen Capital Cost Estimator
The international competition for bids and estimates in plant construction projects is fierce, and SK E&C needed technology and workflow processes that would enable them to compete against rival companies with lower labor costs. Therefore, SK E&C adopted the Aspen Capital Cost Estimator (ACCE) as an integrated cost estimation tool. They defined a systematic workflow to execute projects in a planned manner and created bids in a systematic way. "The owner-operator was faced with the decision of whether to construct a large oil refining facility in Thailand. With the Aspen Capital Cost Estimator, the owner-operator was able to obtain reliable and verifiable budget estimates, allowing SK E&C to execute project cost estimation more easily and flexibly," said Jaeyong Kim, Senior Cost Estimator for Plant Projects at SK E&C. For more details, please refer to the related catalog titled "Korea's SK E&C Reduces Engineering and Estimation Man-Hours by 50% with Aspen Capital Cost Estimator."