[Small Schedule Plan] Production Plan Introduction to Production Scheduler
A production scheduler that automatically formulates short-term plans for engineering, lines, equipment, etc.
【Small Schedule】Production Scheduler Series ○ Load Adjustment with Stacking and Unstacking【Anchor Hybrid】 In addition to intuitive screen operations using Gantt charts, it supports scheduling that takes load into account, such as stacking and unstacking in a block-like manner. With simple master settings and standard external interface integration, it is a production scheduler that is highly compatible with on-site operations. ○ Automatic Schedule Planning Based on Production Capacity【Anchor Multi】 This is a user-friendly production scheduler that achieves the operability, visibility, and high responsiveness required in production sites. It allows for scheduling of processes and equipment usage considering load for each order while simulating production plans in a conversational format. ○ Simulation of Optimal Production Plans for the Textile Industry and Weaving Layouts【Texas Weaving Layout System】 By changing the equipment's rotation speed and operating rate, the expected completion date is automatically adjusted, allowing for simulation of production plans. As a result of the simulation, expected production output, required yarn quantity, and beam change schedules can be viewed at any time.
basic information
【Main Features】 〇 Importing production plans and flexible plan adjustments 〇 Automatic creation of work plans (piling) 〇 Intuitive work adjustments (landslide) 〇 Flexible response to urgent items 【The scheduler solves these problems】 〇 It takes time to plan work, and schedule adjustments are difficult 〇 It is hard to assess the validity of the proposed plan 〇 The schedules of preceding and succeeding processes are unclear 〇 The current status of work in progress and future plans are hard to see 〇 The scheduler has been implemented, but maintaining the master data is challenging 〇 I want to implement it while keeping costs as low as possible _____________________________________ Cosmo Summit's solution business analyzes the challenges faced by customers and considers solutions, or uncovers and makes latent needs apparent. We provide optimal hardware and software. We comprehensively plan, design, build, and operate information systems, including networks.
Price range
Delivery Time
Applications/Examples of results
○ Case Study of Multi-Process Scheduler Implementation At H&F Co., Ltd., which develops, manufactures, sells, and provides after-sales service for press machines and FA system products using consistent in-house technology, a multi-process scheduler has been adopted and implemented. After implementation, scheduling of processes and equipment usage is carried out based on manufacturing instructions output from the core system, and AGV (Automated Guided Vehicle) guidance control is performed according to that schedule. ■ Implemented Product: Multi-Process Scheduler "Anchor Multi"
catalog(4)
Download All CatalogsNews about this product(3)
-
We will be exhibiting at the 40th Ishikawa Information System Fair emesse KANAZAWA 2025.
Date: May 23 (Friday) - May 24 (Saturday), 2025 Venue: Ishikawa Prefectural Industrial Exhibition Hall, Hall 3 (Postal Code: 920-0361, 193 Minami Fukuhata-cho, Kanazawa City, Ishikawa Prefecture) Our Booth: Hall 3, Booth No. 017 We will be exhibiting at the 40th Ishikawa Information Systems Fair emesse KANAZAWA 2025, which will be held at the Ishikawa Prefectural Industrial Exhibition Hall from May 23 (Friday) to May 24 (Saturday), 2025. During the event, we will showcase our specialized system for the textile industry "Texas," our production management system "ReMacs," as well as the production scheduler "Anchor," the similar drawing search system "AI Drawing Search System," information bulletin board system, and electronic manual system. We sincerely look forward to your visit.
-
We will be exhibiting at the Nagoya Design and Manufacturing Solutions Exhibition.
Event Dates: April 9 (Wednesday) to April 11 (Friday), 2025 Venue: Port Messe Nagoya (2-2 Kinjo Futo, Minato Ward, Nagoya City, Aichi Prefecture) (Our Booth: Hall 3, 23-50) We will be exhibiting at the 10th Design and Manufacturing Solutions Exhibition, an IT solutions exhibition for the manufacturing industry, held at Port Messe Nagoya from April 9 (Wednesday) to April 11 (Friday), 2025. During the event, we will showcase our specialized system for the textile industry "Texas," production management system "ReMacs," production scheduler "Anchor," similar drawing search system "AI Drawing Search System," information bulletin board system, electronic manual system, and more. We sincerely look forward to your visit.
-
We exhibited at the 39th Ishikawa Information System Fair "e-messe Kanazawa 2024" (May 16-18).
This time, we exhibited our production management system "ReMacs," the textile industry-specific system "Texas," the "AI Drawing Search System," the production scheduler "Anchor," as well as the information bulletin board system and electronic manual system. Many visitors came to our booth, and it was a great success and concluded smoothly. Our sales representatives will contact the customers who visited our booth at a later date. Additionally, for those customers who were unable to attend, we would appreciate it if you could feel free to contact us.