フカガワ Official site

[Document] High Horse Terminal Installation Procedure

A clear introduction to the installation procedure for high-horse terminals!

Fukagawa Co., Ltd. manufactures and sells machinery, tools, and components for duct production. This document introduces the installation procedure for high-horse terminals. It clearly outlines the steps until completion. 【Tools to Prepare】 ■ Aluminum tape (50mm width) ■ Duct tape (50mm width) ■ Marker pen ■ Scale ■ Scissors ■ Stapler ■ Nippers *For more details, please refer to the PDF document or feel free to contact us.

Related Link - http://www.ductnet.com/

basic information

For more details, please refer to the PDF document or feel free to contact us.

Price range

Delivery Time

Applications/Examples of results

For more details, please refer to the PDF document or feel free to contact us.

High Horse Terminal Installation Procedure

MANUAL

Recommended products

Distributors

Since its establishment, the company has sold product materials including duct manufacturing machines, spiral ducts, and insulated flexible ducts. It has the largest service network in the industry with 41 locations domestically and internationally. Since 2000, it has proposed improvements in on-site work with new materials such as "FEF," an insulation material, and new methods like "Patchin Lock." In 2020, it developed the industry's first fiber laser cutting machine. To realize CAD/CAM, collaboration with BIM is also in progress. In 2022, it sold "air curtains" (manufactured by FRICO in Sweden), capturing 60% of the global market.