ECADソリューションズ Official site

ECAD DCX Implementation Case Study <Nakasaku Co., Ltd.>

Introducing examples of successful work style reforms achieved through the efficiency and standardization of electrical design!

We would like to introduce the issues that were challenges at Nakazaku Co., Ltd., an industrial machinery manufacturer, and the points and effects that were resolved through the introduction of the electrical design CAD 'ECAD DCX.' ■ Background of Introduction - In 2020, amid the uncertainty caused by the COVID-19 pandemic, management instructed each department to "set important medium-term initiatives for their own department and establish goals and action plans." - There were significant differences in work and technical proficiency among members, leading to a concentration of work on a few individuals, which resulted in long working hours becoming a problem. ■ Reasons for Adopting ECAD DCX - ECAD DCX was adopted as a new electrical CAD because it has abundant design support functions and its operability is similar to the previously used ECAD dio, allowing for a smooth implementation. ■ Effects After Introduction - Automatic checks for missing components and consistency between drawings eliminated inquiries from control panel manufacturers, significantly reducing overtime hours. - Using the cabinet collaboration function completely eliminated mistakes, making the arrangement of cabinets much easier. - By standardizing the parts master and operational rules, designers could focus on creating drawings, and the maintenance of the parts master was also managed smoothly.

Ecad Solutions Inc. Website

basic information

The dedicated CAD solution for electrical design, 'ECAD DCX', is a specialized CAD solution that enhances productivity from electrical design to collaboration with purchasing and manufacturing systems. 【Features of ECAD DCX Standard】 ■ Real-time information updates and error detection significantly reduce the effort required for drawing checks. ■ Automatically generates reports such as bill of materials, terminal block tables, and wiring tables from drawing data, improving productivity. ■ During drawing creation, necessary components can be searched and assigned from the cloud-based component library database 'ECAD Library' (support contract required), and selected components can be registered in the master for shared use. ■ Design data connects to purchasing and manufacturing systems, achieving reduced lead times and labor-saving efficiencies. * ECAD DCX is available in Premium / Standard / Basic editions based on the features included. * For more details, please refer to the materials. Feel free to contact us with any inquiries.

Price information

Please contact us.

Delivery Time

Applications/Examples of results

For more details, please download the catalog or contact us.

catalog(13)

Download All Catalogs

ECAD DCX Implementation Case Study <Nakasaku Co., Ltd.> Achieving design efficiency and standardization by switching from ECAD dio to ECAD DCX.

TECHNICAL

ECAD Implementation Case Study <Aiden Co., Ltd.>

TECHNICAL

ECAD Implementation Case Study: Omori Machinery Industry Co., Ltd.

TECHNICAL

ECAD Implementation Case Study <Vantec Corporation>

TECHNICAL

ECAD DCX Implementation Case Study <Daiichi Seidenki Co., Ltd.>

TECHNICAL

ECAD DCX Implementation Case Study <Mitsuba Manufacturing Co., Ltd.> Established an operational system in a short period, improving productivity and reducing workload.

TECHNICAL

ECAD DCX Implementation Case Study <Tomi Industrial Co., Ltd.>

TECHNICAL

ECAD DCX Implementation Case Study <Takashima Engineering Co., Ltd.> Achieving business efficiency by utilizing ECAD-Cabista integration.

TECHNICAL

ECAD DCX Implementation Case Study <Nihon Eidenki Co., Ltd.> Improved Drawing Quality and Productivity through Migration from General-purpose CAD

TECHNICAL

WIRE CAM DX Implementation Case Study <Dainichi Seisakusho Co., Ltd.> "Even unskilled workers can become immediate assets" Achieving efficiency in panel manufacturing!

TECHNICAL

WIRE CAM DX Introduction Case Study <Asahi Corporation> Active operation achieved within one month of implementation thanks to the efforts of young employees.

TECHNICAL

WIRE CAM DX Introduction Case Study <Meito Panel Co., Ltd.> Built a system that allows beginners to perform wiring work in a short period of time, even without prior experience in electrical CAD!

TECHNICAL

News about this product(2)

Recommended products

Distributors