[Delivery Example] Standard delivery response even for different voltage (440V)
The production line has stopped! Can't wait for 1.5 months! Plumbing and electrical work will also be handled by the manufacturer.
● Manufacturing line halted! A competitor's magnetic pump integrated into the existing chiller has failed. Due to the different voltage (440V), we were informed that it would take 1.5 months for delivery, and we received a consultation saying, "The manufacturing line has stopped, and we are in trouble!" With H2's chemical magnetic pump, we can respond to standard delivery times even for different voltages (440V). After selecting a suitable product, the order was placed immediately, and we also received an order for the piping and electrical work associated with the replacement of the competitor's pump. ● Piping and electrical work are also handled by the manufacturer, ensuring speed and quality. In collaboration with our partner company, installation work was carried out on-site immediately after the pump was completed. We faced challenges with piping in a narrow space, but we successfully completed the installation and confirmed that the trial operation adjustments worked without any issues. As in this case, if you are a user facing a failure of a pump with a different voltage and need to restore it as soon as possible, please contact H2.
basic information
For more details, please contact us or download the catalog.
Price information
Please contact us.
Delivery Time
Applications/Examples of results
For more details, please contact us or download the catalog.