Stationary emergency gas generator / ◆ Automatic switching / Power outage detection / Operation monitoring / Regular operation
In case of a power outage, you want to be prepared. A reliable device during a disaster is definitely a generator! Are you familiar with gas-powered generators?
Our company adopts and sells generators that use either LP (propane) gas or city gas as fuel. Since gas hardly degrades, these generators experience almost no fuel-related issues. They are recommended for those who are concerned about the risk of fuel degradation in gasoline or diesel generators. Both LP gas and city gas are managed by specialized contractors. There will be no situations where the engine fails to start during a power outage or runs out of gas. Additionally, by regularly setting up automatic "exercise runs" (scheduled automatic operation), further risk mitigation during power outages can be expected! Moreover, maintenance is simplified with LP gas generators. In recent times, power outages due to frequent disasters have become a concern. Maintaining body temperature is crucial, and electricity is indispensable. In particular, generators that demonstrate the robustness of LP gas are highly recommended. We also offer models that can output standard outlet power (single-phase 100V) as well as three-phase 200/400V power. These are outdoor-installed generators and are waterproof. There is no risk of carbon monoxide poisoning when installed indoors. Please feel free to contact us regarding generator capacity and installation location consultations.
basic information
● Flow during power outage Power outage ⇒ Power outage detection ⇒ Switch operation ⇒ Generator start ⇒ Generator power supply < This takes about 10 to 40 seconds > ● Flow during power restoration Power restoration ⇒ Power restoration detection ⇒ Switch operation ⇒ Power supply switch outage ⇒ Commercial power supply < About 5 seconds > ◆ After restoration, the generator will automatically stop after a cooling operation (about 1 minute). ● Continuous operation time: 100 hours * Requires fuel to be available and recommended oil to be refilled. It is said that power restoration after an earthquake takes 2 to 3 days (about 72 hours). ● Equipped with high-performance AVR (Automatic Voltage Regulator) Provides stable power without an inverter. ● Self-check operation for about 5 minutes Can perform exercise operations at any frequency based on switch settings. Logs are kept, allowing for confirmation and response to normal or abnormal conditions. ● Operation status monitoring via app With WIFI and LTE options, you can check the operating status and logs on your smartphone. ● Options for salt damage-resistant coating and cold climate specifications available Installation in coastal areas or heavy snowfall regions is possible. ● 3-year product warranty
Price range
Delivery Time
Model number/Brand name
GENERAC standby generator (Guardian series) + EMD automatic transfer system
Applications/Examples of results
<Installation Achievements> 〇 Clinics (Small Scale) If the electricity goes out, it can lead to serious issues with dialysis equipment and refrigerators and freezers for medications. There are cases where a UPS alone may not be sufficient. 【Many achievements available】 〇 Corporate Offices, Manufacturing Plants Whether or not a BCP (Business Continuity Plan) is established significantly impacts the future of a company after recovery during a disaster. For the sake of corporate trust and brand, we strongly encourage business owners to consider this. 〇 Server Rooms If servers that handle various data become inaccessible due to a power outage, it can greatly affect operations. Short-term power outages can be managed with a UPS, but long-term outages cannot be handled by a UPS. 〇 Welfare Facilities It is extremely difficult for the elderly and disabled to respond during a power outage. Since the actions of staff members are limited, it may be worth reviewing measures to avoid the worst-case scenario when the electricity goes out. 【Many achievements available】 〇 Shrines, Temples, Shared Facilities If it is a familiar place known to local residents, it can serve as a temporary evacuation site during a disaster. During an incident, the use of various communication media for charging is anticipated.
Line up(5)
Model number | overview |
---|---|
G609(G508) | Output: 9kW (8kVA) Rated Voltage: Single-phase 100/200V Size: 1232mm×648mm×733mm |
G6203 | Output: 20kW Rated Voltage: Three-phase 208V Size: 1232mm×648mm×733mm |
RG632 | Output: 32kW Rated Voltage: Three-phase 208V, Single-phase 100/200V Size: 1950mm×888mm×1171mm |
SG050(SG048) | Output: 50kW (60kVA) Rated Voltage: Three-phase 208V, Single-phase 100/200V Size: 2409mm×965mm×1461mm |
Various other electric capacity models | We will propose options according to your power outage protection needs. |