[Environmental Equipment Delivery Case] Pre-cooling Tower + Venturi Scrubber (1)
The processing gas volume is 100 Nm3! We present a case study of an environmental device designed to remove carbon particles!
We would like to introduce a case study of the delivery of a pre-cooling tower and a Venturi scrubber conducted by E-Techno. The processing gas volume is 100 Nm³, with a temperature consistently between 100-120°C and a maximum of 160°C. The gas cooling design value was established using the provided particle size distribution data, designed to cool from 50°C to below 35°C. The inlet carbon particle (dust) concentration is 3 to 3.5 g/Nm³, and the outlet concentration is below 0.1 g/Nm³ (with an emission standard of below 0.3 g/Nm³). [Case Study] - Industry of delivery destination: Activated carbon manufacturing - Designed and installed equipment: Pre-cooling tower + Venturi scrubber - Target substance for removal: Carbon particles - Outlet gas temperature cooling (Purpose: Reduction of steam white smoke) - Gas-liquid contact: Water (circulation + supply) pre-cooling tower + Venturi scrubber - Material: Pre-cooling tower = heat-resistant, corrosion-resistant FRP, Venturi = corrosion-resistant FRP *For more details, please refer to the PDF document or feel free to contact us.
basic information
For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.