イーテクノ 本社 Official site

[Environmental Equipment Delivery Case] Pre-cooling Tower + Venturi Scrubber (2)

The processing gas volume is 4568 Nm3/h! The gas-liquid contact is achieved with water (circulation + supply) for cooling and hydrogen removal!

We would like to introduce a case study of the delivery of a pre-cooling tower and a Venturi scrubber conducted by E-Techno. The processing gas volume is 4568 Nm³/h, with a temperature of 60.4°C, targeting the removal of white pigment dust, reducing particulate matter from 0.2 g/Nm³ to below 0.01 g/Nm³. Gas-liquid contact is achieved using water (circulation + supply) for cooling and removal of hydrogen chloride. Particles in the circulating liquid are precipitated and collected. [Case Study] - Industry of the delivery destination: Chemical - Equipment designed and installed: Pre-cooling tower + Venturi scrubber - Processing gas volume: 4568 Nm³/h - Target removal substance: White pigment dust - Designed removal rate: Particulate matter from 0.2 g/Nm³ to below 0.01 g/Nm³ - Material: Both the main body and the blower are made of SUS304 *For more details, please refer to the PDF document or feel free to contact us.

Related Link - https://etn-c.com/index.html

basic information

For more details, please refer to the PDF document or feel free to contact us.

Price range

Delivery Time

Applications/Examples of results

For more details, please refer to the PDF document or feel free to contact us.

High-efficiency exhaust gas and dust treatment equipment 【*A rich collection of delivery case studies available!】

TECHNICAL

Distributors

Recommended products