All products and services
31~60 item / All 2828 items
-

[Data] Power Meter Comparison Table
We have published a wealth of information on terminal cover type measuring instruments (One touch MDU) and MDU breakers!
last updated
-

Graphic Operation Terminal "GOT3000 Series"
Using this product as a gateway, you can securely connect data between IT systems and the production site!
last updated
-

[Information] Introduction to Energy Data Collection Package for Manufacturing Sites
We have published various use cases, such as when you want to manage without being affected by production discontinuation responses, as well as various product information!
last updated
-

Small inverter "FR-D800 series"
Three-phase 200V/400V class, with a lineup of 11K/15K! Supports quick identification of causes during troubleshooting.
last updated
-

[Information] Introduction to Mitsubishi Electric General-purpose Inverters
We also provide introductions for each model and suggestions for renewals!
last updated
-

[Case Study] Overhaul Performance of Gear Reducers for Cooling Towers
We will introduce a case where a preliminary meeting was held based on the maintenance plan, enabling a short delivery time response!
last updated
-

[Case Study] LED Lighting Conversion in Logistics Center (Stairs)
Introducing a case where safety on stairs and energy-saving effects are achieved with LED lights equipped with human sensors!
last updated
-

[Case Study] Heavy Load Transport System Using Custom Hoist
Zero clogging and automation compatible! Introducing a case where an ideal transport line was realized with a custom hoist.
last updated
-

[Case Study] Replacement Work from Mercury and Fluorescent Lamps to LED Lighting
We will introduce a case where the replacement construction achieved increased light output and energy savings!
last updated
-
"Robot Handling MZ04/MZ04ER" Fujikoshi
NACHI's small and ultra-fast robot
last updated
-

[Construction Example] Installation of a scissor lift associated with the construction of a food factory.
Case study of the production and installation of a mobile all-SUS scissors lift and PC safety fence.
last updated
-

[Case Study of Replacement Work] Conversion of Office Fluorescent Lights to LED
Achieved approximately 50% reduction in power consumption! Significantly reduced work time and costs associated with lamp replacement.
last updated
-

[Construction Case] Heat Mitigation Measures in the Factory
Achieving reduction in electricity costs and improvement in temperature environment! Case study on the introduction of energy-efficient air transport fans.
last updated
-

[Update Case] Existing Chain Block Renewal Work
We propose suitable products at a total cost including construction expenses! Examples of chain block renewal work.
last updated
-

[Modification Example] Renovation of Metal Fracture Testing Machine
Proposal for resizing the cylinder and installing a flow control valve! Introducing the renovation of the metal fracture testing machine.
last updated
-

[Inspection Case] Annual Inspection of Hoist Crane at Chemical Production Plant
Comprehensive inspection of hoist cranes from multiple manufacturers! Achieving cost reduction and smooth response.
last updated
-

[Construction Example] Installation of Windbreak Curtains for Outdoor Laundry Area
Achieving rain and wind protection while complying with fire safety regulations! Proposing a high-strength curtain that can be opened and closed.
last updated
-

[Construction Case] Boiler Room Fire Wall Renovation and Window Expansion Work
We will introduce a case of improving the opening and closing of fire doors through replacement and adjustments.
last updated
-

[Construction Example] Conveyor Belt Replacement and Pulley Lining Work
During regular inspections of the conveyor, we confirmed the deterioration of the belt pulley! Here are examples of replacement and repair work.
last updated
-

[Repair Case] Conveyor Belt Damage
Conveyor belt damaged in high-temperature furnace repaired in one day with in-situ repair! Cost reduction also achieved.
last updated
-

[Replacement Work Example] Compressor
We propose the replacement with a screw compressor and the installation of a sub-tank!
last updated
-

[LED Case Study] Customer Warehouse Lighting
70% reduction in power consumption and suppression of insect intrusion! Multifaceted improvement of the work environment through the LED conversion of warehouse lighting.
last updated
-

[Replacement and Exchange Construction Examples] PLC to Sequencer
Replace discontinued PLCs with Mitsubishi Electric sequencers! Comprehensive support from appropriate model selection to construction.
last updated
-

[Retrofit Example] Industrial Robot for Workpiece Supply to NC Lathe
Update aging robots! The lead time per product has been shortened, and the range of automation compatibility has also expanded.
last updated
-

[Construction Case] Replacement work due to the aging of a 2.8-ton crane
Removal and installation of the existing hoist crane completed in one day!
last updated
-

Industrial detergent
We offer a wide selection of commercial detergents that can be chosen according to your needs.
last updated
-

Rust removal cleaning agent "Rust Quick"
Safe cleaning with a neutral type that is considerate of metals! No need for neutralization, and it also improves on-site work efficiency.
last updated
-

Commercial Hand Soap "Hand Quick eco"
Scrub particles derived from natural corn cobs effectively remove stubborn oil stains.
last updated
-

Factory and kitchen detergent "Bio Quick"
Introducing a commercial cleaning agent that can eliminate stubborn grease stains with the power of ions.
last updated
-

Commercial cleaning agent "Bio Hard Cleaner"
A commercial cleaning agent that is safe to use and not subject to various environmental regulations (PRTR Law, RoHS).
last updated