エフ・アイ・ティー・パシフィック Official site

Data Center Management 'VM7 iDC Visual Manager'

We manage the planning, operation, monitoring, and analysis of data centers comprehensively!

We can create a shared database for various information that has been managed separately in different files and systems by each center and department, including floor layout diagrams, rack implementation diagrams, various wiring diagrams, equipment management tables, asset ledgers, and incident management tables, allowing for centralized management of information. 【Integrated Management of Racks and Power Equipment】 We will manage floor layout diagrams, rack implementation diagrams, various equipment information, and connection information for communication and power cables in an integrated manner. 【LAN and Power Wiring Management】 We will visualize and manage in detail the connection routes and information for LAN wiring and power cables between devices. 【Power Consumption & Weight Management and Monitoring Integration】 We will manage information related to power measurement devices and sensors for power, temperature, and humidity, as well as monitor the environment and weight.

Data Center Management System "VM7 iDC Visual Manager"

basic information

【Rack Management】 ■Floor Layout Management ■Rack Implementation Management 【Equipment Information Management】 ■Management of information for equipment and facilities installed in racks 【Wiring Management】 ■Management of cable wiring diagrams/network connections 【Power Equipment Management】 ■Management of cable wiring diagrams/power equipment 【Power Consumption Management】 ■Automatic aggregation and display of power consumption and installed weight 【Environmental Management Integration】 ■Compatible with environmental monitoring systems for temperature, current, etc. 【Report Input/Output】 ■Import/Export of rack-mounted equipment ■Load rack automatically by reading report data listing rack-mounted equipment 【Others】 ■Thermal Flow Analysis: Linking modeling information within the center to the analysis system ■Output equipment asset information to report data from attribute items of rack-mounted equipment

Price range

P5

Delivery Time

OTHER

Model number/Brand name

VM7 Series

Applications/Examples of results

Integrated management of wiring systems and constituent equipment such as communication line networks, network wiring, and power cables in offices, tenants, and data centers. Management of plant piping within factories. 【Operational Examples】 ◆ Power consumption and weight management per rack ◆ Power connection management from equipment to breaker ◆ Equipment installation and asset management  ・Floor area: 1,000m2  ・Number of racks: 450  ・Number of devices: Approximately 10,000 【Main Clients】 Telecommunication carrier data centers: Rack implementation management, power, thermal calculations (1,000 racks) Data center operators: Rack implementation management, power, thermal calculations (150 racks) Securities company data centers: Layout, rack implementation management, power (400 racks) Domestic financial data centers: Rack implementation diagrams, power, thermal calculations (500 racks) Domestic bank data centers: Layout, rack implementation management, power, asset management (4,200 racks) Manufacturing data centers: Rack implementation management, equipment assets (300 racks / managed equipment count 1,400) Pharmaceutical companies: Rack implementation management, equipment assets (70 racks)

Data Center Total Management "VM7 iDC Visual Manager"

PRODUCT

Recommended products

Distributors