服部建築事務所 Official site

Cost reduction point for factory construction: "Implement measures against floor cracks."

Points for Designing Factories with High Quality and Low Cost [Floor Slab Section]

Cracks in the floor slab can cause various adverse effects, such as a decrease in the accuracy of equipment. There are various causes of cracks in floor concrete, but the influence of overhead cranes (overhead conveyors) is also a factor. The vibrations from the crane can be transmitted from the columns to the floor slab, leading to the occurrence of cracks. To prevent this, a cushioning strip can be installed between the columns, foundation, and floor slab to absorb vibrations, which can help reduce the occurrence of cracks to some extent. 【Points】 ■ Implement measures against floor slab cracks ■ The causes of crack occurrence can also be found in the upper part of the building ■ The surprisingly significant occurrence of cracks due to crane vibrations ■ Establish a shock-absorbing strip to mitigate upper vibrations ■ The methods applied to the floor slab vary depending on the production equipment For more details, please refer to the catalog or feel free to contact us.

Related Link - http://kojokensetsucostdown.com/point/point05.html

basic information

For more details, please refer to the catalog or feel free to contact us.

Price information

Please contact us.

Delivery Time

Applications/Examples of results

For more details, please refer to the catalog or feel free to contact us.

Technical Information: 10 Design Points for Reducing Costs in Factory Construction

TECHNICAL

Recommended products

Distributors