Summary of the Supply and Stacking Work Area | Example of Battery Plate Manual Stacking Table Production
We will introduce a case where the storage area for materials and the stacking location were consolidated into a single work area, facilitating the handover process before and after.
We would like to introduce a case study of the design and production of a dedicated table for workers to stack the plates and insulation materials that go inside the battery in order. By consolidating the storage area for materials and the stacking area into a single workspace, we facilitate the handover process before and after the work. This allows for the supply of materials, stacking, and handover of finished products to be done in a designated area, reducing the effort of going back and forth to retrieve materials and temporarily placing stacked components, making it easier to focus on manual stacking tasks. [Case Overview] ■ Purpose: Manual stacking workstation for plates ■ Work Improvement: Reducing the effort of going back and forth to retrieve materials and temporary placement *For more details, please download the PDF or feel free to contact us.
basic information
[Points for Design and Production] ■Arrangement of the Work Surface: Confirm the dimensions and weight of the plates being handled and the order in which they will be stacked, and create a work surface that allows components to be arranged within reach. ■Arrangement of Surrounding Equipment: Determine the height of the table and the arrangement of surrounding equipment considering the side supplying materials and the side receiving the completed laminated products. *For more details, please download the PDF or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please download the PDF or feel free to contact us.
catalog(1)
Download All CatalogsRecommended products
Distributors
Development and manufacturing of a variety of conveying equipment and peripheral devices. Furthermore, through the combination of individual machines, we expand into efficient line systems, and Heiwa Harty realizes flexible construction of conveying systems.