3D prototype modeling, short delivery time prototyping, casting prototyping

日之出水道機器 メカニカルスティッチ部
● The production time for cast prototypes can be shortened! Since model production is unnecessary, the time required to create prototypes, which used to take about a month, can be significantly reduced. ● Model costs can be reduced! By directly producing sand molds from 3D data, there is no need for model production costs. If changes to the model are necessary, they can be addressed by modifying the 3D data. ● Similar products with different shapes and dimensions can be prototyped simultaneously! Different products, such as similar shapes or varying dimensions, can be created in a single molding process. This allows for the verification of multiple types in a short period.
