茨城スチールセンター 本社 Official site

[Case Study on Problem Solving] Lead Time and Cost of Prototype Production

Production of prototype work from stock materials! Using a 6kw laser, we provided a small quantity of various types with a 1mm difference.

The customer was struggling with whether to create molds for prototypes based on different conditions or to prepare them using full machining, which would require a lot of money and time, as part of the pre-mass production stage. Therefore, we proposed the production of prototype workpieces from stock materials. Using a 6kw laser, we provided prototype workpieces (a small number of various types with a 1mm difference) immediately. As a result, we were able to reduce the costs of prototype molds and lead times. 【Case Summary】 ■Issue: Struggling with prototyping as a pre-mass production stage ■Solution: Produced prototype workpieces from stock materials using a 6kw laser ■Effect: Reduced costs of prototype molds and lead times *For more details, please refer to the PDF document or feel free to contact us.

Related Link - http://www.ibaraki-sc.co.jp/

basic information

For more details, please refer to the PDF document or feel free to contact us.

Price range

Delivery Time

Applications/Examples of results

"Do you have any of the following concerns?" - Management and cost issues related to multi-process (using multiple presses) - Rising component costs due to increased material prices - Cost issues with multiple hole processing - Management of multiple parts - Distortion due to heat treatment processes - Machining time - Lead time and cost when creating prototypes - Management of multiple outsourcing *For more details, please refer to the PDF document or feel free to contact us.

Case Studies of Problem Solving by Ibaraki Steel Center Co., Ltd.

TECHNICAL

Distributors

Recommended products