イハラサイエンス Official site

Ihara's piping design case study

Simplifying complicated piping! Achieving space-saving without the need for skilled workers.

We will introduce a case study where we achieved a 30% cost reduction in the 3D design of Ihara's piping before and after. (Compared to our company) It is possible to significantly reduce costs easily and reliably by addressing issues such as "excessive number of connections/joints" and "excessive number of pipes/hoses." Additionally, space-saving can be achieved without the need for skilled workers. 【Features】 ■ Significant cost reduction ■ Substantial reduction in installation time ■ Easy and reliable ■ No skilled workers required ■ Space-saving *For more details, please refer to the PDF document or feel free to contact us.

For inquiries, please click here.

basic information

For more details, please refer to the PDF document or feel free to contact us.

Delivery Time

OTHER

Applications/Examples of results

For more details, please refer to the PDF document or feel free to contact us.

Ihara's piping design case study

TECHNICAL

Eliminate the need for on-site adjustments with Ihara's piping system!

TECHNICAL

40% reduction in plumbing labor! Why not eliminate existing piping with "Pittari-kun"?

TECHNICAL

Reduce the maintenance construction period by 35%.

TECHNICAL

Pipe installation outsourcing service to solve labor and skilled worker shortages.

TECHNICAL

Recommended products

Distributors