Proposal from the piping contractor: Fewer fittings are better.
If the costs are the same, wouldn't you want to reduce effort and risk? We will propose the optimal piping solution tailored to your needs.
"Do you want to reduce costs further? Also, do you need shorter fittings by 5mm?" Why not leave these concerns to us? We offer optimal piping solutions tailored to your needs, including custom cross fittings, custom valves, and prefabricated piping. Please feel free to consult us when you need assistance. 【Case Study of Piping Improvement for a Certain Equipment Manufacturer】 ■Conventional - Cluttered and cramped with too many fittings - Difficult installation due to the number of fittings ■Ihara - Clean layout - Easier installation with fewer fittings - Reduced costs and troubles *For more details, please refer to the PDF document or feel free to contact us.
basic information
【Effect Examples】 <Conventional> ■Number of joints: 28 ■Assembly time: 36H ■Inspection time: 12H <Ihara> ■Number of joints: 16 (-43% effect) ■Assembly time: 20H (-45% effect) ■Inspection time: 8H (-33% effect) *For more details, please refer to the PDF document or feel free to contact us.
Delivery Time
OTHER
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
Related Videos
catalog(3)
Download All Catalogs
"Long Joint" {Achieving Cost Reduction and Shortening Construction Period}

Proposal from the piping contractor: Fewer fittings are better.
