40% reduction in plumbing labor! Why not eliminate existing plumbing with "Pittari-kun"?
Isn't the alignment of piping just a routine task? With Ihara, you can eliminate that alignment.
In piping construction, on-site adjustments (known as "gen-gou") are inevitable. Even if the piping is manufactured according to the drawings, during installation, there may be instances where: - Dimensions are insufficient - Positions do not align - Adjustments are needed for installation, which can necessitate on-site adjustments. However, with Ihara's prefabricated piping method called "Pittari-kun," it is possible to eliminate on-site adjustments. This can significantly reduce the time and costs associated with piping construction. Ihara's unique technology, "Pittari-kun!" can eliminate on-site adjustments. ↓↓ For more details, please watch the "related videos" at the URL below ↓↓
basic information
For more details, please refer to the PDF document or feel free to contact us.
Delivery Time
OTHER
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.
Related Videos
catalog(9)
Download All Catalogs
Ihara's piping design case study

40% reduction in plumbing labor! Why not eliminate existing piping with "Pittari-kun"?

A slight change in the piping can lead to significant cost savings.

By reviewing the piping, we achieved a 30% reduction in the size of the equipment!

Reduce the maintenance construction period by 35%.

Pipe installation outsourcing service to solve labor and skilled worker shortages.

"Hey! Right now!" The "Oi-sugu Flange" for responding to emergencies.

Oi-sugu Flange tightening device
