Support for the elimination of dependency on specific individuals and the efficiency improvement of design work for waste management.
Experts will support the standardization of the design process and the sharing of know-how for the automatic generation of plant configurations.
In the waste treatment industry, plant design requires precise management of complex piping and equipment configurations, as well as the sharing of information across projects. Particularly in the automatic generation of plant configurations, tracking past design rationales and change histories is essential, as the dispersion of information can lead to design errors and rework. Our company supports the analysis of the current state of design operations, centralized management of specifications, and standardization of the design process, thereby enhancing operational efficiency and facilitating the transfer of technology. 【Usage Scenarios】 - Standardization of component specifications and centralized management of drawings in plant configurations - Searching and reusing past design change histories - Visualizing the piping design know-how of veteran designers and passing it on to younger engineers 【Benefits of Implementation】 - Reduced workload due to improved searchability of specifications and design data - Elimination of dependency through standardization of the design process - Prevention of mistakes and rework through thorough management of design change histories
basic information
【Features】 - Understanding the current state of design operations and conducting issue hearings - Visualization of the design process and business analysis - Review of management methods for past drawings and design data - Support for sharing and standardizing design know-how - Consideration for improving design change history and version management 【Our Strengths】 Through the business ecosystem 'exbridge', we collaborate with expert consultants and solution partners in the manufacturing and design fields. Rather than focusing solely on system implementation, we propose optimal improvement measures tailored to your current challenges and support sustainable growth.
Price range
Delivery Time
Model number/Brand name
Exbridge (Gemco Operations)
Applications/Examples of results
【Main Uses and Examples】 - Improving the workflow of the design department, which takes time to search for past drawings - Sharing design know-how in made-to-order production of unique items - Enhancing work efficiency by reusing design data from similar projects - Transferring technology in preparation for the retirement of veteran designers - Reviewing the management of drawing change history and the latest versions - Eliminating the personalization of design work and standardizing processes - Considering improvements in the sharing methods of CAD environments and design information 【Example Target Industries】 Industrial machinery, manufacturing equipment, metal processing, machine parts, various made-to-order manufacturers *The above are potential use cases and do not indicate actual implementation results.
Line up(5)
| Model number | overview |
|---|---|
| Analysis of the current state of design business and organization of issues. | Understand the workflow of the design business and the tasks of each person in charge, and organize issues such as dependency on individuals, rework, and information sharing. Clarify the priorities for improvement and consider initiatives aimed at increasing efficiency. |
| Improvement of search and reuse of past drawings and design data. | We will review the storage and search methods for past drawings and design data to promote reuse in similar projects. We will support the creation of management methods and information-sharing systems to effectively utilize design assets. |
| Visualization and standardization of design know-how | Organize and visualize the experience, judgment criteria, and design procedures of veteran designers. Review tasks that depend on individual personnel, and support the stabilization of design quality and the transfer of know-how to young engineers. |
| Improvement of design change history and version management | We will review the change history of drawings and design data, as well as the management methods for the latest versions, aiming to reduce information mix-ups and the burden of verification work. We will consider improvement measures based on the existing CAD environment and data management system. |
| Support for the efficiency of design operations and the transmission of technology. | Identify waste and duplicate work in design operations, and support the establishment of systems for standardizing operations and transferring technology. We will consider initiatives that lead to improved productivity in the design department and ongoing improvement activities. |
catalog(36)
Download All Catalogs
News about this product(1)
Recommended products
Distributors
Optimal solutions for solving management challenges! A company that provides network business aimed at a business ecosystem. Together with the most suitable experts tailored to your management and on-site issues, we realize problem-solving. Developing a face-to-face platform business called 'exbridge' for the business ecosystem. We build a business network to support problem-solving in relation to the issues and management challenges faced by companies, in collaboration with specialized solution partners. We provide services through networks aimed at sustainable growth. Planning and managing seminars and events for building a business ecosystem.


![[Free Consultation] Are your factory's cybersecurity measures sufficient? Preparing for the risk of production stoppage.](https://image.mono.ipros.com/public/news/image/1/2116324/IPROS12252281805040207346.png?w=280&h=280)















































