All products and services
31~44 item / All 44 items
-

Heatstroke Prevention with Unique Roof Fit for Construction Sites
Extruded polystyrene foam insulation + spray polyurethane waterproofing for heat prevention at the workplace!
last updated
-

Prevent peeling of exterior finish mortar and more! Ultra-high-performance protective coating method.
Protecting buildings from harsh natural environments for a long time! Proven to reduce damage even during the Hanshin-Awaji Earthquake.
last updated
-

Prevent salt damage and freeze damage! Ultra-high-performance protective coating method.
Protect buildings from harsh natural environments for a long time! Prevent the infiltration of chloride ions, oxygen, and moisture from the outside.
last updated
-

Prevent leaks and corrosion of rebar! Ultra-high-performance protective coating method.
Protect buildings from harsh natural environments for a long time! Prevents concrete expansion cracks.
last updated
-

Super high-performance protective coating method "Alon Wall" with construction examples included.
Protect the building's exterior walls for a long time with four concepts! Includes standard process flow, etc.
last updated
-

Roof renovation method "Unique Roof Fit" <Contributes to electricity cost savings>
Renovation methods applicable to various roofs! Demonstrating insulation performance + waterproof performance.
last updated
-

Roof renovation method "Unique Roof Fit" <Heat stroke prevention measures in the workplace>
Extruded polystyrene foam insulation + spray polyurethane waterproofing!
last updated
-

Roof renovation method "Unique Roof Fit"
Introducing construction using building materials listed in the catalog for heatstroke prevention in the Kanto region!
last updated
-

When is the recommended time for large-scale renovation work?
Introducing the advantages and disadvantages by season! An explanation of large-scale renovation work in spring, summer, autumn, and winter.
last updated
-

Points to check when selecting a contractor for large-scale renovation work.
Explanation of checkpoints such as reference achievements, technology and expertise, and on-site management by full-time employees of the construction company!
last updated
-

Painting work
If more than 7 years have passed since the last construction work, caution is required!
last updated
-

Interior construction
Leave it to Joscom, which offers consistent in-house construction from design to on-site execution!
last updated
-

Exterior wall renovation work
Contributing to the longevity of condominiums and buildings through exterior renovation work that enhances the asset value of the property!
last updated
-

Waterproofing work
Waterproofing work is essential for maintaining the safety of the city. It addresses various areas of buildings, starting from rooftops and roofs.
last updated