Super high-performance protective coating method "Alon Wall" with construction examples included.
Protect the building's exterior walls for a long time with four concepts! Includes standard process flow, etc.
This document introduces the ultra-high-performance protective coating method "Alon Wall," which focuses on extending the lifespan of buildings and considering the environment. It includes "Characteristics of Alon Wall Coating," "Suitability of Various Methods and Finishing Paints," and "Standard Process Flow for Alon Wall." It also features "Technical Data" and "Construction Examples," making it a useful reference when considering implementation. 【Contents (partial)】 ■ Building Protection ■ Aesthetic Maintenance ■ Environmental Consideration ■ Cost Performance ■ Characteristics of Alon Wall Coating *For more details, please download the PDF or feel free to contact us.
basic information
【Other Published Content (Partial)】 ■ Suitability of Various Construction Methods and Finishing Coatings ■ Standard Process Flow for Alon Wall ■ Standard Process Flow for Alon Wall - Construction Methods Compliant with the Ministry of Land, Infrastructure, Transport and Tourism's Standard Specifications for Public Building Renovation ■ List of Standard Specifications ■ Alon ACC Method and Peeling Prevention Method ■ Alon ACC Method *For more details, please download the PDF or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please download the PDF or feel free to contact us.
catalog(1)
Download All CatalogsRecommended products
Distributors
Joscom will thoroughly inspect and investigate the current condition of the buildings and carry out appropriate maintenance and repair work that contributes to their longevity. In our company, many young skilled workers are actively engaged on-site. The fact that our own craftsmen carry out the work requested by customers can truly be described as "direct delivery from the construction site." Joscom will continue to aim for the longevity of buildings and maintain the "direct delivery from the construction site" approach.






















