[Case Study] CASE09: Plating Processing Factory, Company T
Improved cleaning performance with degassed liquid external oscillation cleaning! Complete drying achieved for various parts through temperature control in the drying chamber.
Company T is engaged in contract plating processes for Ni and Sn. The parts entrusted by customers are washed with a hydrocarbon cleaning machine before the plating process. The equipment is aging, and an update is being considered. The process flow was "Tank 1: Vacuum ultrasonic cleaning → Tank 2: Vacuum cleaning," but due to cleaning failures leading to plating defects, unnecessary steps such as passing through twice were involved, and there were also issues with inadequate drying. Therefore, we introduced our "CLEANVY." By cleaning with "Tank 1: Degassing liquid external oscillation system → Tank 2: Vacuum ultrasonic cleaning," we can achieve a clean finish in one cleaning cycle and resolve the issues with inadequate drying. [Challenges] ■ One pass through the cleaning machine is not sufficient, leading to plating defects. ■ There are many types of parts, and some may experience inadequate drying. ■ The maintenance costs for the vacuum pump are high. *For more details, please refer to the PDF document or feel free to contact us.
basic information
【Results】 ■ High cleaning performance achieved with just one pass through the cleaning machine due to the effect of degassed liquid external oscillation ultrasonic cleaning. ■ Complete drying of all parts by managing the temperature in the drying chamber. ■ Maintenance-free with a unique vacuum drying system. *For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.