Next-generation load device "LCR load device" that realizes the efficiency of solo driving tests.
This is an LCR load device that can be used for tests specified in the "Individual Test Methods for System Interconnection Protection Devices."
This is a single-phase three-wire alternating current load device that supports various tests as LC loads and R loads. It is also possible to configure test equipment linked with other measuring instruments and power supplies through computer control. By using our developed products such as the grid connection test software (sold separately) and the power conditioner evaluation system (PVU01403), automatic grid connection testing for solar power system power conditioners can be conducted.
basic information
【LC Load Device】 ● Lineup of 2, 4, 8, 12 [kVar] (capacity customizable) ● Capable of adjusting reactive power in 1 [Var] increments ● Quantitative adjustment of leading/lagging reactive power ● Output status can be obtained as data ● Composed solely of passive components, not electronic loads, as an accurate reactive power load 【R Load Device】 ● Lineup of 2, 4, 8, 12 [kW] (capacity customizable) ● Capable of adjusting load values in 1 [W] increments ● Allows for quantitative testing without manual operation ● Measures AC voltage, current, and power with a panel meter and obtains output status as data ● Equipped with safety features such as temperature abnormality stop function and overvoltage protection function
Price range
Delivery Time
Applications/Examples of results
Automatic implementation of grid connection tests for solar power generation system power conditioners. *Using our developed products such as grid connection test software and power conditioner evaluation system (PVU01403).
catalog(10)
Download All Catalogs





News about this product(2)
-
The email newsletter "Epsilon Communication Issue 45" has been distributed.
Thank you for your continued support. This is Nippon Kernel System Co., Ltd. We are sending you the 45th issue of the Epsilon Newsletter along with information on recommended pavilions for the Osaka-Kansai Expo from our employees. The distribution is later than usual due to last week's summer holiday period. ─▼──────────────────────────────── Table of Contents [1] A new automatic testing system has been completed [2] The catalog for "R Load Device and LC Load Device" has been updated [3] Editor's Note ─▲──────────────────────────────── You can view the continuation on our company website.
-
The R load device and LC load device catalog has been renewed.
We have renewed the product features and applications to make them easier to understand, so please take a look. ーーーーーーーーーー This is a next-generation load device composed solely of passive components (resistors, reactors, capacitors) that allows for the setting of active/reactive power (leading/lagging). By connecting a computer software to a power meter, constant power control is possible even when the voltage changes. In evaluating power supplies and measuring instruments (such as power conditioners, UPS, power factor transducers, etc.), tests can be conducted without worrying about control resonance or load responsiveness that may occur when using electronic loads. Additionally, when evaluating power conditioners, using our grid connection testing software in conjunction allows for automatic execution of everything from load adjustment for anti-islanding tests to test implementation and report generation, significantly reducing the man-hours required for testing.