ケー・エフ・シー Official site

ShieM-CS(TN) Method [Measures for preventing spalling + Measures for preventing deterioration]

Small pieces can simultaneously prevent concrete deterioration and can be completed in one day.

■NETIS Registered, Registration Number: CG-140001-VR ■By applying the ShieM (Seam)-CS sheet, which is a laminated structure of a high barrier film and a lattice-like fiber sheet, it is possible to simultaneously implement "spalling prevention measures" and "deterioration prevention measures" for concrete. *NETIS Registration Number: CG-140001-VR *Meets the quality standards of NEXCO Tunnel Construction Management Guidelines 【Features】 ■Wetless Due to its four-layer structure, including a high barrier film, it has a "wetless structure" that prevents adhesive from permeating the sheet body or surface, allowing for immediate application of the topcoat after sheet adhesion, thus shortening the process. ■Handling While maintaining adequate strength, the sheet has been minimized in thickness to improve workability, making it easy to handle even for unskilled workers, thereby enhancing construction efficiency. Small-scale projects can be completed in one day. ■Excellent Workability By minimizing the thickness of the sheet while maintaining adequate strength, it can be applied even in sections including corners and edges. *For more details, please refer to the PDF document or feel free to contact us.

Related Link - http://www.kfc-net.co.jp/crp/

basic information

【Specifications】 ■ShieM-CS Sheet  W=970mm  50m/roll ■ShieM-TN Sheet  W=485mm  30m/roll *For more details, please refer to the PDF document or feel free to contact us.

Price range

Delivery Time

Applications/Examples of results

【Purpose】 ■Measures to prevent concrete spalling ■Measures to prevent concrete deterioration *For more details, please refer to the PDF document or feel free to contact us.

Gainah SH sheet board method (tunnel, concrete structure reinforcement)

PRODUCT

Gainatunnel interior sheet

PRODUCT

Recommended products

Distributors

As a pioneer in post-installed anchors in Japan, KFC was established in 1965. We respond to customer needs with a consistent system from product development to sales and construction. Our business activities are centered around three main areas: construction fastening materials such as post-installed anchors, materials for tunnel excavation like rock bolts and auxiliary methods, and various construction works related to seismic reinforcement, safety measures, equipment, and refreshment.