永和工芸 Official site

The culprit of poor adhesion after degreasing was leaving it unattended: the essence of pre-treatment management.

Have you not waited after defatting? That "waiting time" may be causing the paint to peel.

Even if the degreasing process is carried out properly, the quality of the paint can vary significantly due to subsequent management. The longer the time after degreasing that the surface of the parts is contaminated again with oil or dust, the lower the adhesion of the paint film will be. Time management from pre-treatment to painting is the key to preventing painting defects.

Related Link - https://kinzokutoso.com/

basic information

Metal surface preparation before painting

Price range

Delivery Time

Applications/Examples of results

Improvement of painting quality

Related Videos

Eihō Kōgei Co., Ltd. Company Profile | Metal Coating, Coating Removal, Zinc Plating, Pre-treatment for Coating, Test Coating, Mass Production Coating

COMPANY

Distributors

We are not just a "subcontracted painting factory." Established in 1958, our company has a foundation of painting technology and also specializes in chemical treatment, stripping, and cleaning, functioning as the "external surface treatment department" in your organizational chart. Based on our philosophy of "preparation is eight-tenths of the work," we emphasize participation from the "upstream process" before the drawings are finalized. We conduct test painting on a wide range of metals and difficult materials, and we produce the entire process from assembly, packaging, to delivery, thereby reducing your management workload. Additionally, by being able to perform zinc phosphate treatment in-house, we achieve stable painting quality. Furthermore, our micro-heating stripping technology, which does not use chemicals, maintains the electrical state of the "jigs (hangers)" that influence painting quality. Our approach of "pre-treatment determines painting quality" ensures the stability of the paint film during mass production. Rather than simply "applying specified standards," we work backwards to achieve optimal painting specifications and prevent scratches during transportation, sparing no effort in thorough discussions from the outset. This diligent preparation is the shortest path to preventing rework and minimizing total costs. From the development stage, please utilize the expertise of our specialists as part of your production line.