鋼機産業 Official site

Examples of factory plant equipment manufacturing - Steel frame production

We would like to introduce a case of manufacturing and delivering a coke oven platform weighing 163 tons!

Among our numerous achievements, we would like to introduce a case of manufacturing a coke oven platform. This product was delivered to JFE Steel Corporation, East Japan Works (Chiba Area). Our company designs various plants, machinery, and equipment. We propose cost reductions through measures such as preventing errors with 3D modeling and automatic drafting of working drawings. 【Case Overview】 ■ Request: Manufacturing of coke oven platform ■ Delivery Location: JFE Steel Corporation, East Japan Works (Chiba Area) ■ Weight: 163 tons *For more details, please refer to the PDF document or feel free to contact us.

Related Link - http://www.kohki-sangyo.co.jp/company/jisseki.html

basic information

For more details, please refer to the PDF document or feel free to contact us.

Price range

Delivery Time

Applications/Examples of results

For more details, please refer to the PDF document or feel free to contact us.

[Production Example 4] Chiba Coke Oven Platform Production

TECHNICAL

Recommended products

Distributors