鋼機産業 Official site

Case study of manufacturing factory and plant equipment: Production of molten steel ladles (6 units)

Weight 338 tons! Here we introduce a case of manufacturing and delivering six molten steel ladles under the guidance of our customer.

Among our numerous achievements, we would like to introduce a case where we manufactured six molten steel ladles under the guidance of JFE Mechanical Corporation. These were delivered to JFE Steel Corporation, West Japan Works (Kurashiki Area). In the steel industry, we design various plants, machinery, and equipment, proposing cost reductions through measures such as preventing errors with 3D modeling and automating the creation of working drawings. 【Case Overview】 ■ Request: Manufacture of 6 molten steel ladles ■ Delivery Destination: JFE Steel Corporation, West Japan Works (Kurashiki Area) ■ Weight: 338 tons *For more details, please refer to the PDF document or feel free to contact us.

Related Link - http://www.kohki-sangyo.co.jp/company/jisseki.html

basic information

For more details, please refer to the PDF document or feel free to contact us.

Price range

Delivery Time

Applications/Examples of results

For more details, please refer to the PDF document or feel free to contact us.

Case study of manufacturing factory and plant equipment: Production of molten steel ladles (6 units)

TECHNICAL

Recommended products

Distributors