熊谷精機 Official site

[Technical Proposal Example] 30% Cost Reduction through Integrated Machining of Multiple Parts

By welding multiple parts together, the product was completed, but now it is being processed as a single unit using progressive stamping!

This is a technical proposal example for the production of color frames. In conventional methods, the processing of parts before welding and the welding work required significant man-hours and lead time, along with strict requirements for product dimensions and precision, which led to challenges such as prolonged lead times and high costs. We proposed a shift from a method that involved welding multiple parts to an integrated processing method using progressive stamping and cold forging. This achieved a 30% cost reduction and a 50% reduction in lead time. [Case Overview] ■ Challenge: Production through welding of multiple parts ■ Proposal: Integration of multiple parts through a shift to progressive stamping *For more details, please refer to the related links or feel free to contact us.

Related Link - https://metal-stamping-costdown.com/proposal/%e8%a…

basic information

For more details, please refer to the related links or feel free to contact us.

Price range

Delivery Time

Applications/Examples of results

For more details, please refer to the related links or feel free to contact us.

Company Profile - Kumagai Seiki

COMPANY

Recommended products

Distributors