倉持鉄工 Official site

[Example] Installation work for industrial dryers (such as hot air dryers)

Preliminary surveys, on-site inspections, and heavy cargo loading and unloading operations! We also conduct trial operation adjustments.

We would like to introduce a case where we performed installation work for industrial dryers (such as hot air dryers) at our company. The process of installation work (heavy equipment work) involves conducting a preliminary survey and site confirmation (checking the structure of the installation location and the routes for transportation in and out), followed by the execution of heavy equipment transportation work. We also carry out installation and leveling adjustments (aligning the installation position, leveling, and securing anchor bolts) as well as trial operation adjustments. 【Flow of Installation Work】 1. Preliminary survey and site confirmation 2. Heavy equipment transportation work 3. Installation and leveling adjustments 4. Trial operation adjustments *For more details, please feel free to contact us.

Related Link - https://www.kuramochi-tekkou.jp/

basic information

For more details, please feel free to contact us.

Price range

Delivery Time

Applications/Examples of results

For more details, please feel free to contact us.

Distributors

Recommended products