Reactor (Reactor) [Made by GE] AC 800kV/6000A compatible
■50 years of achievements ■Delivery record: 50,000 units worldwide ■Maintenance-free (only annual exterior inspection) ■Inspections and repairs will be handled by our company.
■Design to estimate in 10 days ■Price is less than half of that of oil-filled reactors ■Due to the use of FRP (fiber-reinforced plastic) structure, it is high-strength, lightweight, and excellent in weather resistance ■Stable insulation performance using air insulation → Can be used with only annual visual inspections since it does not use oil ■Despite its large capacity, it can be installed in a vertical arrangement, reducing installation space 【Applications】 ■Short-circuit current (current limiting) ■For transmission lines 【Track Record】 Numerous delivery records to domestic manufacturers ■Railway industry ■Heavy electrical industry ■Power industry *For more details, please refer to the PDF materials or feel free to contact us.
basic information
The timing for replacing insulating oil varies depending on environmental conditions and maintenance status, but it is generally said to be about 5 to 10 years for open types and about 10 to 15 years for sealed types. This product uses air insulation, so it does not require insulating oil and can be used for over 25 years with only an annual visual inspection. 【Accessories】 ■ Corona ring ■ Bird deterrent ■ Insulating material ■ Base ■ Enclosure ■ Tapping *For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.