Twice the productivity compared to pipe welding construction.
Productivity improvement and reduction of man-hours achieved! Approximately 2.5 times more work related to fittings can be done in one hour.
The "LOKRING joint" allows for the assembly/preparation/installation of 50 to 60 units on-site in a single shift. In terms of assembly at typical job sites, it boasts double the productivity compared to pipe welding. The increase in productivity for general tasks enables cost reduction. By using LOKRING, productivity improvements and a decrease in man-hours are achieved, allowing for approximately 2.5 times more joint-related work to be done in an hour. 【Features of LOKRING Joint】 ■ Allows for the assembly/preparation/installation of 50 to 60 units on-site in a single shift ■ Boasts double the productivity compared to pipe welding ■ Enables cost reduction ■ Achieves productivity improvements and a decrease in man-hours ■ Allows for approximately 2.5 times more joint-related work to be done in an hour *For more details, please refer to the PDF document or feel free to contact us.
basic information
For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.