[Case Study of Heat Recovery] Cooling Tower Water Heat Recovery
Introducing case studies on the introduction of cooling tower water heat recovery!
At MDI, we handle various energy-saving devices, including plate heat exchangers, as well as cleaning solutions. From energy-saving consulting to after-sales maintenance, we consistently provide high-quality services to our customers. In the "Waste Heat Recovery Case Studies," we introduce energy-saving examples of boiler feedwater heating using ultra-compact heat pumps that utilize heat from open cooling towers. For any inquiries or consultations regarding waste heat recovery and energy savings, please feel free to contact us. 【Cooling Tower Water Heat Recovery】 <Existing Issues> ■ Concerns about rising cooling water temperatures in midsummer ■ Soaring fuel costs for boilers ■ Environmental degradation due to the emission of waste heat and exhaust gases, which contribute to global warming ■ Need to remove dirt (sand, dust) from cooling tower circulating water *For more details, please refer to the PDF materials or feel free to contact us.
basic information
Cooling Tower Heat Recovery <MDI's Proposal> Installation of heat exchangers, heat pumps, and multi-cyclones <Cost of this Heat Pump System> ■ Annual measured electricity consumption: 7.73kWh/12000=92.76MWh (equivalent to 23.8kL of crude oil) ■ Annual electricity cost: 1,390,000 yen/year ■ Reduced fuel cost: 2.5 million yen/year ■ Energy savings: 20.0kL/year ■ Equipment cost: 5,000,000 yen ■ Investment recovery: 2.0 years *For more details, please refer to the PDF document or feel free to contact us.
Price range
Delivery Time
Applications/Examples of results
For more details, please refer to the PDF document or feel free to contact us.